In the districts of Bichishausen and Hundersingen, west of these towns, we are planning a wind farm with six wind turbines and a total output of 37,8 MW.
The Project
The E-175 turbines from the German manufacturer Enercon are expected to produce around 79.200 million kWh of clean electricity, which can supply around 45.200 people.
The wind turbine sites are located on agricultural fields and meadows. From March 2024 to March 2025 a wind measurement is carried out.
Key data
number of plants
6
WEA type
Enercon E-175 EP5
hub height
approx. 162,5 m
rotor diameter
175 m
Total power park
37,8 MW
Yield per wind turbine pa
approx. 13.200 MWh
Yield in the park pa
approx. 79.200 MWh
CO₂ savings per wind turbine pa
approx. 8.000 T/CO₂
Power Supply
approximately 45.200 people
Mains connection
The distribution network operator Netze BW has assigned a grid connection point on the existing 110 kV overhead line between Steingebronn - Dottingen, approximately 7,5 km as the crow flies north of the planned wind farm, where the electricity is to be fed into the public distribution network.
Schöller SI will build its own substation at this location.
project schedule
– All information corresponds to the current planning status –
Value creation in the Münsingen region
Local security of supply
Location advantage for trade and industry
Contribution to the achievement of the area objectives of the Federal Republic of Germany
Investment opportunities
Invest together.
Invest with us in a sustainable future and benefit from a real asset that is independent of the capital market.
The citizens of Bichishausen-Hundersingen and the surrounding region will be given priority to participate.
Inform now
You are welcome to register your interest today. We are currently still in the project development phase and will actively approach you with further information in due course.