On the district Bottingen We planr southeast the village a wind farm with three Wind Turbines and an Total output of 18,9 MW.
The Project
The E-175 turbines from the German manufacturer Enercon are expected to produce around 45.000 million kWh of clean electricity, which can supply around 25.700 people.
The wind turbine sites are located on agricultural fields and meadows. Wind measurements have already been successfully completed.
Adjacent to the project is a wind farm that was commissioned in 2000 and consists of three NEG-Micon NM48/750 wind turbines, each with a hub height of 70 m.
With our Böttingen-Buch project, we are creating another concentration zone for wind power, thereby contributing to achieving the area targets of the Federal Republic of Germany.

Key data
number of plants
3
WEA type
Enercon E-175 EP5
hub height
approx. 162,5 m
rotor diameter
175 m
Total power park
18,9 MW
Yield per wind turbine pa
approx. 15.000 MWh
Yield in the park pa
approx. 45.000 MWh
CO₂ savings per wind turbine pa
approx. 8.100 T/CO₂
Power Supply
approximately 25.700 people
Mains connection
The distribution system operator Netze BW has allocated a grid connection point on the existing 110 kV overhead line Laichingen – Schmiechen, approximately 9 km as the crow flies northeast of the planned wind farm, where the electricity will be fed into the public distribution grid.
For this purpose, Schöller SI will build its own substation in the Sontheim district with a transformer size of 80/100 MVA, which is expected to be completed in April 2025 and will also serve as a grid connection point for the Magolsheim wind farm is used.
To leverage synergy effects, part of the external cable route of the Böttingen-Buch wind farm is already being laid with that of the Magolsheim wind farm. This has the advantage of ensuring optimal use of the available construction space, taking into account existing road and path infrastructure, third-party lines, and nature conservation concerns such as adjacent protected areas and existing vegetation.
project schedule
– All information corresponds to the current planning status –
Value creation in the Münsingen region
Local security of supply
Location advantage for trade and industry
Contribution to the achievement of the area objectives of the Federal Republic of Germany
Investment opportunities
Invest together.
Invest with us in a sustainable future and benefit from a real asset that is independent of the capital market.
The citizens of Böttingen and the surrounding region will be given priority to participate.
Reserve
You are welcome to register your interest today. We are currently still in the project development phase and will actively approach you with further information in due course.