Böttingen-Buch wind farm

On the district Bottingen We planr southeast the village a wind farm with three Wind Turbines and an Total output of 18,9 MW. 

18 +

MW

Overall Performance

45000 +

MWh/year

yield

25700 +

People

supplied with electricity

The highest added value for you and your community

The Project

The E-175 turbines from the German manufacturer Enercon are expected to produce around 45.000 million kWh of clean electricity, which can supply around 25.700 people.

The wind turbine sites are located on agricultural fields and meadows. Wind measurements have already been successfully completed.

Adjacent to the project is a wind farm that was commissioned in 2000 and consists of three NEG-Micon NM48/750 wind turbines, each with a hub height of 70 m.
With our Böttingen-Buch project, we are creating another concentration zone for wind power, thereby contributing to achieving the area targets of the Federal Republic of Germany.

Wind farm planning Magolsheim

Key data

number of plants

3

WEA type

Enercon E-175 EP5

hub height

approx. 162,5 m 

rotor diameter

175 m 

Total power park

18,9 MW

Yield per wind turbine pa

approx. 15.000 MWh

Yield in the park pa

approx. 45.000 MWh

CO₂ savings per wind turbine pa

approx. 8.100 T/CO₂

Power Supply

approximately 25.700 people

Mains connection

The distribution system operator Netze BW has allocated a grid connection point on the existing 110 kV overhead line Laichingen – Schmiechen, approximately 9 km as the crow flies northeast of the planned wind farm, where the electricity will be fed into the public distribution grid.

For this purpose, Schöller SI will build its own substation in the Sontheim district with a transformer size of 80/100 MVA, which is expected to be completed in April 2025 and will also serve as a grid connection point for the Magolsheim wind farm is used.

To leverage synergy effects, part of the external cable route of the Böttingen-Buch wind farm is already being laid with that of the Magolsheim wind farm. This has the advantage of ensuring optimal use of the available construction space, taking into account existing road and path infrastructure, third-party lines, and nature conservation concerns such as adjacent protected areas and existing vegetation.

project schedule

Q2/2022 – Q4/2022

potential surface analysis

Q4 / 2023

Completion of land protection

Q3/2023 – Q4/2024

Examinations under nature and species protection law

February 2023 – February 2024

Wind measurements at the site

Q1/2024 – Q4/2024

Technical park configuration

Q2 / 2025

Submission of application for approval according to BImSchG

Q4 / 2025

BImSchG approval

Q1 / 2026

EEG tender/project financing

Q2 / 2027

OPERATION

– All information corresponds to the current planning status –

MUNICIPAL PARTICIPATION

Municipal participation according to Section 6 EEG:

To allow communities and municipalities located near our wind farms to participate financially in our projects, we pay, among other things, a voluntary municipal levy pursuant to Section 6 of the Renewable Energy Sources Act (EEG) upon commissioning of new construction projects. This amounts to 0,2 cents per kilowatt-hour of electricity fed into the grid.

Value creation in the Münsingen region

Economic participation for local citizens and municipalities

Financial participation for the municipalities through lease payments, electricity revenues according to §6 EEG and trade tax revenues

Schöller SI with regionally based employees as a long-term contact

Regional added value

Flagship project for the region

Contribution to climate protection

Local security of supply

Location advantage for trade and industry

Contribution to the achievement of the area objectives of the Federal Republic of Germany

THE HIGHEST ADDED VALUE FOR YOU AND YOUR COMMUNITY

With regional ties, we have been setting an example for an environmentally conscious energy supply for 16 years.

Further information about wind energy and the benefits for citizens
can be found in our flyer “Regional value creation”

Download

Investment opportunities

Invest together.

Invest with us in a sustainable future and benefit from a real asset that is independent of the capital market.

The citizens of Böttingen and the surrounding region will be given priority to participate.

Reserve

You are welcome to register your interest today. We are currently still in the project development phase and will actively approach you with further information in due course.

    I have read and accepted the Imprint and the Privacy Policy This website is protected by hCaptcha technology, which must be loaded before the contact form can be submitted. Therefore, the hCaptcha Privacy Policy and Terms & Conditionsapply. Please first click on “I am human” and then on “Submit”.

    Impressions of the planned location

    Scroll to the beginning