The Project
The Enercon E-175 EP5 E2 turbines are expected to produce around 27,2 million kWh of clean electricity, enough to supply approximately 15.500 people.
The wind turbine sites are located on agricultural land. Wind measurements were already carried out as part of the development of the neighboring area. Böttingen-Buch wind farms Successfully completed. Due to the geographical proximity, no additional wind measurements are necessary. Furthermore, the project development of the Böttingen-Buch wind farm, planned southeast of the municipality of Böttingen, will create synergies, particularly through the shared use of the construction infrastructure.

Key data
number of plants
2
WEA type
Enercon E-175 EP5 E2
hub height
approx. 162,5 m
rotor diameter
175 m
Total power park
14 MW
Yield per wind turbine pa
approx. 13.600 MWh
Yield in the park pa
approx. 27.200 MWh
CO₂ savings per wind turbine pa
approx. 8.242 t/CO₂
Power Supply
approximately 15.500 people
Mains connection
The distribution network operator Netze BW has assigned a network connection point on the existing 110 kV overhead line Laichingen-Schmiechen at a distance of approximately 9 km northeast of the planned wind farm, where power is to be fed into the public distribution network.
At the network interconnection point, during the implementation of the Magolsheim wind farm A substation was built by Schöller SI Erneuerbare GmbH, which is also operated by them. The Böttingen-Hühnerbühl wind farm is connected to the public grid via this substation. Part of the cable route is already being laid as part of the installation work for the Böttingen-Buch wind farms laid concurrently. Further synergies are expected through the cable route of the Magolsheim II wind farm arise.
project schedule
– All information corresponds to the current planning status –

"The measured further development of the wind turbine site, which is highly accepted, especially by the residents of Böttingen, is to be welcomed. The new turbines will allow us to offer participation opportunities to the residents of Böttingen, similar to those offered in Magolsheim. With Schöller SI, we have found the right and reliable partner for this project as well."
Mike Münzing, Mayor of the City of Münsingen
Münsingen, May 30, 2026
Wind farm Böttingen-Hühnerbühl planned: Two new turbines are to replace three existing turbines
Schöller SI Erneuerbare GmbH is planning the Böttingen-Hühnerbühl wind farm in the Böttingen district, consisting of two modern wind turbines. The plans call for two Enercon E-175 EP5 E2 turbines, each with a total height of approximately 250 meters and a combined output of 14 MW.
A key feature of the project is the planned minimum distance of 1.000 meters to residential areas. At the same time, the three existing wind turbines in Böttingen, which were commissioned in 2000, are scheduled to be decommissioned and subsequently dismantled in 2027.
The project aims to further develop and modernize the use of wind energy at the site.
The two planned wind turbines will increase electricity production tenfold compared to the three existing turbines. At the same time, we are significantly increasing the distance to residential areas.
explains Johannes Wild, Managing Director of Schöller SI Renewables GmbH.
The town of Münsingen, local mayor Ralf Hintz, and Schöller SI Erneuerbare GmbH see the project as an important contribution to the regional energy transition. At the same time, the development should be carried out carefully and with due consideration for the interests of the local community.
Mike Münzing, mayor of the city of Münsingen, explains:
The measured expansion of the wind farm site, which is highly accepted, especially by the residents of Böttingen, is to be welcomed. The new turbines will allow for similar investment opportunities for the people of Böttingen, as is the case in Magolsheim. With Schöller SI, we have once again found the right and reliable partner for this project.
Ralf Hintz, the local mayor of Böttingen, says:
I welcome the foreseeable dismantling of the existing wind turbines, as the new turbines will allow for a greater distance from residential areas and generate more power than the existing ones. Especially considering the land use in agricultural areas, it is crucial to carefully consider where the turbines and the necessary infrastructure are located and how much space they occupy. Böttingen has a comparatively small agricultural area of approximately 220 hectares – therefore, responsible and careful management is particularly important here.
Value creation in the Münsingen region
Local security of supply
Location advantage for trade and industry
Contribution to the achievement of the area objectives of the Federal Republic of Germany
Investment opportunities
Invest together.
Invest with us in a sustainable future and benefit from a real asset that is independent of the capital market.
The citizens of Böttingen and the surrounding region will be given priority to participate.
Reserve
You are welcome to register your interest today. We are currently still in the project development phase and will actively approach you with further information in due course.