Käpfle wind farm

Southwest of the city of Reutlingen, we are planning a wind farm in the Reutlingen and Pfullingen districts, which is expected to include four turbines.  

Inform now
28 +

MW

Overall Performance

48000 +

MWh/year

yield

27500 +

People

supplied with electricity

The highest added value for you and your community

The Project

A future-oriented wind energy project is being developed in Reutlingen:  

Four modern wind turbines from Enercon will generate around 48 million kilowatt hours of environmentally friendly electricity annually. This corresponds to the average electricity needs of approximately 27.500 households – sustainably and regionally. 

The wind turbines will be erected at carefully selected locations in forested areas belonging to the city of Reutlingen. Responsible use of nature and the landscape is particularly important to us. After their operational lifespan, the forest areas will be reforested and all areas will be returned to their original state, ensuring continued sustainable use. 

The Neckar-Alb Regional Association is currently working on a partial update of the regional plan to identify suitable areas for open-space photovoltaic systems and wind energy utilization. The goal is to implement the legal requirement to designate 1,8% of the region's area for wind energy and 0,2% for solar energy.
On July 22, 2025, the Association Assembly approved the second consultation draft. The resolution on the partial update is expected by the end of 2025. The wind farm is located in the area planned by the Neckar-Alb Regional Association.

Key data

number of plants

4

WEA type

Enercon E-175 E5 E2

hub height

approx. 174,5 m

rotor diameter

175 m 

Total power park

28 MW

Yield per wind turbine pa

approx. 12.000 MWh

Yield in the park pa

approx. 48.000 MWh

CO₂ savings per wind turbine pa

approx. 8.100 t/CO₂

Power Supply

approximately 27.500 people

Mains connection

The grid connection can likely be realized relatively close to the project via the existing 110 kV overhead line. The exact grid connection point will be assigned to us as the project progresses.
In collaboration with engineers from Fichtner GmbH & Co. KG and the Center for Solar Energy and Hydrogen Research Baden-Württemberg (ZSW), we are currently also examining the possibilities for integrating a photovoltaic system and a battery storage system.

THE HIGHEST ADDED VALUE FOR YOU AND YOUR COMMUNITY

With regional ties, we have been setting an example for an environmentally conscious energy supply for 16 years.

Further information about wind energy and the benefits for citizens
can be found in our flyer “Regional value creation”

Download

Investment opportunities

Invest together.

Invest with us in a sustainable future and benefit from a real asset that is independent of the capital market.

Priority will be given to the citizens of Reutlingen, Pfullingen and the surrounding region to participate.

Reserve

You are welcome to register your interest today. We are currently still in the project development phase and will actively approach you with further information in due course.

    I have read and accepted the Imprint and Privacy policy This website is protected by hCaptcha technology, which must be loaded before the contact form can be submitted. Therefore, the hCaptcha Privacy policy and Terms of Useapply. Please first click on “I am human” and then on “Submit”.

    WIND ENERGY IN REUTLINGEN

    Frequently Asked Questions

    The city of Reutlingen provides comprehensive information on current plans, projects, and background information regarding the use of wind energy in the city. Stay up to date and learn more about the sustainable energy future of our region.

    To the website of the city of Reutlingen