Skip to content

Seißenlehr wind farm

In the districts of Heroldstatt and Laichingen, we are planning a wind farm with eight wind turbines and a total capacity of 56 MW.

Inform now
56 +

MW

Overall Performance

122000 +

MWh/year

yield

70000 +

People

supplied with electricity

The highest added value for you and your community

The Project

The Enercon E-175 EP5 E2 turbines are expected to produce around 122 million kWh of clean electricity, enough to supply approximately 70.000 people.

The wind turbine sites are located on agricultural fields and meadows. Wind measurements have already been successfully completed.

Adjacent to the project, another wind farm is being developed east of the municipality of Heroldstatt. The joint project development creates synergies, particularly through the shared use of construction infrastructure.

Wind farm planning Seißenlehr

Key data

number of plants

8

WEA TYPE

Enercon E-175 EP5 E2

hub height

approx. 174,5 m 

rotor diameter

175 m 

Total power park

56 MW

Yield per wind turbine pa

approx. 15.000 MWh

Yield in the park pa

approx. 122.000 MWh

CO₂ savings per wind turbine pa

approx. 9.090 t/CO₂

Power Supply

approximately 70.000 people

Mains connection

The distribution network operator Netze BW has assigned a network connection point on the existing 110 kV overhead line Laichingen-Schmiechen at a distance of approximately 3,5 km south of the planned wind farm, at which feed-in to the public distribution network is planned. 

At the network interconnection point, during the implementation of the Magolsheim wind farm A substation was built and is operated by Schöller SI Erneuerbare GmbH. According to current plans, the Seißenlehr wind farm will be connected to the public grid via an extension of this substation. 

project schedule

Q3/2023 – Q4/2023

potential surface analysis

February 2024

Completion of land protection

June 24 – June 25

Wind measurements at the site

30.06.2025

Submission of application for approval according to BImSchG

Q1/2025 – Q4/2025

Technical park configuration

Q3/2024 – Q1/2026

Examinations under nature and species protection law

Q2 / 2026

BImSchG approval

Q4 / 2026

EEG tender/project financing

Q1 / 2027

start of building

Q2 / 2028

OPERATION

– All information corresponds to the current planning status –

MUNICIPAL PARTICIPATION

Municipal tax according to §6 EEG

To allow towns and municipalities located near our wind farms to financially participate in our projects, we pay, among other things, a voluntary municipal levy in accordance with Section 6 of the German Renewable Energy Sources Act (EEG) from the commissioning of new construction projects. This amounts to 0,2 cents per kilowatt-hour of electricity fed into the grid.

added value in the region Heroldstatt

Economic participation for the citizens and municipalities site

Financial participation for the community through lease payments, electricity yields according to EEG §6 and trade tax revenue

Schöller SI with regional resident employees as a long-term contact

Regional added value

Flagship project for the region

Contribution to climate protection

Local security of supply

Location advantage for trade and industry

Contribution to the achievement of the area objectives of the Federal Republic of Germany

THE HIGHEST ADDED VALUE FOR YOU AND YOUR COMMUNITY

With regional ties, we have been setting an example for an environmentally conscious energy supply for 16 years.

Further information about wind energy and the benefits for citizens
can be found in our flyer “Regional value creation”

Download

Investment opportunities

Invest together.

Invest with us in a sustainable future and benefit from a real asset that is independent of the capital market.

Priority will be given to citizens of Heroldstatt and Laichingen and the surrounding regions to participate. 

Reserve

You are welcome to register your interest today. We are currently still in the project development phase and will actively approach you with further information in due course.

    I have read and accepted the Imprint and Privacy policy This website is protected by hCaptcha technology, which must be loaded before the contact form can be submitted. Therefore, the hCaptcha Privacy policy and Terms of Useapply. Please first click on “I am human” and then on “Submit”.

    Non-binding visualizations

    Scroll to the beginning