Another pioneering project is in the starting blocks: A wind farm with six wind turbines from the German manufacturer is being built in the Bichishausen and Hundersingen districts ENERCON of type E-175 EP5.
Key data of the project:
🔹 Number of systems: 6
🔹 Total output: 37,8 MW
🔹 Yield per year (entire park): approx. 79.200 MWh
🔹 CO₂ savings per wind turbine pa: approx. 8.000 tons
🔹 Supply range: approx. 45.200 people with clean electricity
The wind turbines will be built on agricultural fields and meadows. We will carry out wind measurements by March 2025 in order to have a stable basis for preparing the wind reports. The farm is scheduled to go into operation in Q1/2027.
Share buttons require marketing cookies.
Please accept marketing cookies to enable sharing via AddToAny.
